Hi Guru,

do we have anything called as transport planning time in material master?

Thanks

siva

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

solved

pankaj_singh9
Active Contributor
0 Kudos

Hi,

In material master, we don't have any field as "Transport Planning Time", It has following time fields which take part in ATP and Transfer of Requirement in MRP views;

- Planned Delivery Time

- In-house Production Time

- Total Replenishment Lead Time

Former Member
0 Kudos

hi,

its not there in material master.

it has two fields

1 )planning time in mrp 2-- which is lead time of material to come.

second is gr proceesing time in mrp 1 i.e time for gr processing by store department.

regards

ramesh

points if helpful/solved