milestone confirmation.

IN a particular operation i need to confirm at 2 points in the entire operation and at the end of the operation. so i have to do 3 confirmations at 20 60 80. 80 is my final operation.so will all there three confirmations be milestone confirmations.but if i dont do the confirmation at 20 the system should not allow me to do the 60 confirmation.

but if i make all the three operations as milestone confirmations if i confirm at 60 confirmation. then the 20 operation also will be confirmed.can i confirm an operation at 20 with out confirming at 10.if the confirmation is not milestone.

how to do this help meout.

where do i make a confirmation a milestone confirmation.

i think we will be having an option in the control key.

replied

Hi Deepu,

As you told maintain the 3 Milestone operations in the routing.System will not allow you to do the confirmation for 60 until the first milestone operation(20) is complete.

You can confirm operation 20 without confirming operation 10(if 10 is not a critical operatio) by doing the setting in control key as confimation possible but not necessary.

hope it will help

with regards

Girish