hello

I would like to make assemly processing, assignement between SD and PS, what I have at this time:

1. I have standard project with one element PSP the structure is:

AR-0001 - definition,

AR-0001 - main element,

AR-0001.01 one element PSP,

I checked SD/PS assignement

2. I have standard network:

10000 - network definition,

10 - internal activity

3. I have material index

this is HAVA type, in MRP 3 view in strategy group field I entried 80

4. I have in CN08 assignements:

material index width above standard network, and above standard element AR-0001.01

So when I create in VA01 SD order the system doesn't generate project. Why? What should I check more to generate SD order?

Accepted Solutions (0)

Answers (2)

Answers (2)

virendra_pal
Active Contributor
0 Kudos

try strategy group 85

Former Member
0 Kudos

Link below should be able to provide you the check:

http://help.sap.com/saphelp_erp60_sp/helpdata/en/95/1613a8837b11d2b6700000e82d8bd1/content.htm

Regards