Hello friends,

I want to activate quality inspection for 309 movement type i.e.Transfer posting material to material.

I have created inspection plan with usage 5 and activated inspection type 05 - inspection for other goods receipt in material master.

But still the system is not creating inspection lot

when I am transffering material of one batch to another with 309 mo. type.

Regards,

Amit Shirsath.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Amit,

you are transfering material stock to material stock correct.

then activate Inspection type 08 for stock transfer in Material master and check.

Regards,

Anil

Former Member
0 Kudos

Hi Anil,

The solution is working, but now in following case

Batch1 (100 kg) = batch 2 (60 kg) + batch 3 (40kg)

When I am doing stock transfer, then system is generating two inspection lots for batch 1 i.e. for

60kg one lot and 40 kg for another lot.

I have to generate only one lot of 100 kg for batch 1.

Please guide,

Regards,

Amit Shirsath.

Former Member
0 Kudos

Hi Anil,

This is done thank you, i have changed in material master for inspection type 08, control inspection lot creation.

Regards,

Amit.

former_member263130
Participant
0 Kudos

Dear Amit,

As each partial quantity results into individual transfer movement, system will create two inspection lot, one for each partial quantity movement.

Bye for now.