Dear all,

when i use va01 to trigger a project, the project should be automatically generated.

but my problem is when i save the sales order, the dialogue box appears and asks me to fill in the standard network, network profile. After that, it asks me to fill in the billing element.

How could i trigger the project automatically?

how can i link the standard network and sales order? i mean the configuration.

thanks a lot.

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

thanks for both of you.

the first problem is solved.

now the second comes i don't know where the problem is

when i save the project, an runtime error appears.

following is the message:

Probably the only way to eliminate the error is to correct the program.

-

If the error occures in a non-modified SAP program, you may be able to

find an interim solution in an SAP Note.

If you have access to SAP Notes, carry out a search with the following

keywords:

"MESSAGE_TYPE_X" " "

"SAPMV45A" or "MV45AF0B_BAPIDATEN_ERMITTELN"

"BAPIDATEN_ERMITTELN"

thanks a lot.

Former Member
0 Kudos

thank you very much.

the problem is solved.

we can update the CRM and it will be alright.

former_member214674
Contributor
0 Kudos

Hi

You just need to assign variant configurator to standard network and standard project in CN08.

Regards

virendra_pal
Active Contributor
0 Kudos

fill values in transaction CN08 for assy processing