on 09-22-2008 2:09 PM
How should i configurate in the IMG-project system-material-Procurement indicator for material components
,and Check acct asst categories and document types for purc.reqs,also network profile, so that i can get purc.reqs and reservation at the same time when adding a material to the activity below a wbs?
Right now it just has reservation no purc.reqs.
Thanks!
regards,
tiger wu
hi,
Please check in material master of the material. In MRP 4 tab in Individual/coll. box, check the entry whether it is 1 or 2. If it is 2 then while attaching the material system will not ask you any option and will directly take procurement type as 'Reservation for network'
If it is 1 then it will ask the option which you desire.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
Maintain procurment indicator by OPS8,Material Flow in Network,NF. for network.
Then try.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Check network profile in OPUU..."Res/Purc.req" should not be 1...make it 2 and try.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.