on 09-22-2008 1:24 PM
hi
I would like to cost one of cost collector for material in KKF6N.
I have material it is material type HALB. In KKF6N I have entries:
Cstg variant planned - PREM,
Cstg variant actual - PPP3,
Costing sheet - PP-PC1
Result analysis key - 000003
other fileds I have empty no value.
I click on Cost icon, and after this I get Error message in protocol like below
1. Consumption account cannot be determined.
2. Costing items for material xxx in plant xxx without cost element.
3. Cost component split costed with value of zero.
Details for 1. are:
Diagnosis
During automatic account determination, the system could not find a consumption account with the following criteria:
Chart of accounts : CAPL
Transaction : GBB
Valuation/acct modification : /VBR
Valuation class : 3000
Procedure
Go into Customizing and check the settings for account determination.
For 2. are:
Diagnosis
The itemization for material 300000051 in plant ZZAR contains valuation-relevant items without a cost element.
System Response
The costs of these item(s) cannot be included in the cost component split. This means that there will be inconsistencies between the cost component split and the itemization.
Procedure
Check the log for further system messages for material 300000051 in plant ZZAR. Correct the error and carry out costing again.
Can anybody help me with these errors. Where I should check everything in customization to work for this in correct way?
First things first...
You may want to correct the entries in T030 (T Code OBYC) and maintain and entry for:
CAPL - GBB - <blank> - VBP - 3000
Hopefully the error should disappear once this is done.
Cheers.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
This message was moderated.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Check posting rule in OBYC for all valuation class/material type. Then go to OKTZ assign cost element for components usage
Regards
Dinabandhu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Ok I am not sure about OKTZ:
In Assignement Cost Component - Cost Element Interval I have :
1 Raw materials
2 Human resources
3 Production
4 Material overhead
5 Production overhead
6 Admin. overhead
7 Sales overhead
8 External processing
9 Miscellaneous
when I click to Raw materials I can see that
01 - CAPL - 411000 - empty - 411000 - 1 - Raw materials
In Assignement Organiz. Units - Cost Component Struc I added these rows:
ZP01 ++++ ++++ 01.01.2008 01 Sample Layout
ZP01 ++++ PREM 01.01.2008 01 Sample Layout
ZU01 ++++ ++++ 01.01.2008 01 Sample Layout
ZU01 ++++ PREM 01.01.2008 01 Sample Layout
but calculation (cost) don't work.
Hi Adam,
You need to do 2 settings.
1. OBYC setting
2. OKTZ setting. Please assign the cost element interval in this screen.
Hope it helps!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
94 | |
11 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.