hi

I would like to cost one of cost collector for material in KKF6N.

I have material it is material type HALB. In KKF6N I have entries:

Cstg variant planned - PREM,

Cstg variant actual - PPP3,

Costing sheet - PP-PC1

Result analysis key - 000003

other fileds I have empty no value.

I click on Cost icon, and after this I get Error message in protocol like below

1. Consumption account cannot be determined.

2. Costing items for material xxx in plant xxx without cost element.

3. Cost component split costed with value of zero.

Details for 1. are:

Diagnosis

During automatic account determination, the system could not find a consumption account with the following criteria:

Chart of accounts : CAPL

Transaction : GBB

Valuation/acct modification : /VBR

Valuation class : 3000

Procedure

Go into Customizing and check the settings for account determination.

For 2. are:

Diagnosis

The itemization for material 300000051 in plant ZZAR contains valuation-relevant items without a cost element.

System Response

The costs of these item(s) cannot be included in the cost component split. This means that there will be inconsistencies between the cost component split and the itemization.

Procedure

Check the log for further system messages for material 300000051 in plant ZZAR. Correct the error and carry out costing again.

Can anybody help me with these errors. Where I should check everything in customization to work for this in correct way?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

First things first...

You may want to correct the entries in T030 (T Code OBYC) and maintain and entry for:

CAPL - GBB - <blank> - VBP - 3000

Hopefully the error should disappear once this is done.

Cheers.

Answers (3)

Answers (3)

Former Member
0 Kudos

This message was moderated.

Former Member
0 Kudos

Hi

Check posting rule in OBYC for all valuation class/material type. Then go to OKTZ assign cost element for components usage

Regards

Dinabandhu

adam_sobkowicz2
Active Participant
0 Kudos

Ok I am not sure about OKTZ:

In Assignement Cost Component - Cost Element Interval I have :

1 Raw materials

2 Human resources

3 Production

4 Material overhead

5 Production overhead

6 Admin. overhead

7 Sales overhead

8 External processing

9 Miscellaneous

when I click to Raw materials I can see that

01 - CAPL - 411000 - empty - 411000 - 1 - Raw materials

In Assignement Organiz. Units - Cost Component Struc I added these rows:

ZP01 ++++ ++++ 01.01.2008 01 Sample Layout

ZP01 ++++ PREM 01.01.2008 01 Sample Layout

ZU01 ++++ ++++ 01.01.2008 01 Sample Layout

ZU01 ++++ PREM 01.01.2008 01 Sample Layout

but calculation (cost) don't work.

former_member740051
Contributor
0 Kudos

Hi Adam,

You need to do 2 settings.

1. OBYC setting

2. OKTZ setting. Please assign the cost element interval in this screen.

Hope it helps!