Hi there.

We are working in SRM 5.5 with classic scenario

I created a PO from a Bid accepted, but I can not see the PO number in the SCu2019s Follow-on documents either Bidu2019s history

My process flow was:

SC u2192 Bid invitationu2192 Bidu2192 PO (Created in the ECC system)

All work OK, but I canu2019t see the PO number in the SCu2019s Follow-on documents either Bid Invitationu2019s history .

In transaction BBP_PD I can see the PO number reference to my BID, but no in functional view.

Is this a standard behavior?

Is there any way to show the PO number in the original SCu2019s history?

Thanks and regards.

Raúl.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Muthu.

The PO number is not available in graphic either table view.

So, I'll create a OSS message.

Thanks for all Muthu

Raúl.

Former Member
0 Kudos

Please check CLEAN_REQREQ_UP job is running. Besides check the table BBP_DOCUMENT_TAB. If this has an entry then the job is not successful.

Hope this helps.

Regards

Kathirvel

Answers (1)

Answers (1)

former_member183819
Active Contributor
0 Kudos

Hi

As per standard in Bid Invitation History must show PO number . As well in SC you must get it PO in the follow on document ( Number in BACKEND LOGICAL SYSTEM NAME) since it is a classic scenario. try to see diaplay as table

regards

Muthu