I have a BOM(bill of material).and from time to time,engineer like to change the BOM by using "Change Number" ,so it is clear in the menu of T.C cs03, you can find the "change no.",but this T.C is only down to the second lower level and not down to the lowest level,

For me, I want to export the whole BOM out and with change no. attached,then I can trace all change no. for this BOM

Any advices are welcome

helai

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member184655
Active Contributor
0 Kudos

Dear helai,

Your question is not clear,can you please clearly explain what are you looking in using Change number?

1.Using a Change number you can make BOM changes at single level in CS02.

2.Same Change number can be used for making various material's BOM changes.

3.If it's a Change number with release key,once if the release key is set for the change number ,then that

change number cannot be used for making any BOM changes.

4.Before setting the release key you can use the same change number for various BOM corrections.

5.For reports check using T codes CC04,CC05,CC07.

Please check & revert back if you need any further assistance.