cancel
Showing results for 
Search instead for 
Did you mean: 

Routing with wrong cost center

Former Member
0 Kudos

Hello Expert,

Our costs from one route are being assigned to a wrong cost center. We need to change the cost center that is assigned to this route. The current cost center is 310100 but we needed it to be the 310310. We need to know where can we change this assignment.

Thanks for the help.

Regards.

Accepted Solutions (1)

Accepted Solutions (1)

former_member184655
Active Contributor
0 Kudos

Dear Ryan,

Is the activity rate that's defined for a Cost center+activity type combination is same for both the cost

centers 310100 & 310310? If not means then after changing the Cost center in costing tab key for the

particular Work center in CR02,you have to do a re cost estimate.

If already a standard cost estimate exists for that particular material means,then you have to reorganise

the existing standard Cost Estimate using T code CKR1 and then you have to take a Cost Rollup.

If some confirmation has been made already means then cancle that and after taking the Released cost

estimate,do those confirmations once again so that proper cost is getting accumulated.

For you knowledge purpose ,I'm sharing this with you.

1.Create a Cost center using T code - KS01.

2.Create an activity type using T code - KL01.

3.Assign the Rates for an activity type & cost center combination using T code KP26.

4.In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal

Year as 2008,enter the cost center, activity type click on overview screen (F5)---> enter the per hour Rate

under Fixed price and set value as 2 for distribution key and plan price indicator as 3.

5.After performing this ,while creating the work center ,this combination of activity type & cost center

should be assigned.Then while creating routing/task list this work center can assigned for performing

operations.

Check with this & revert back if you need any further help.

Regards

Mangalraj.S

Former Member
0 Kudos

Hello,

Thanks for the immediate response, my client send me screenshots of a Material document oh her, with error. in the General tab view the material has error since in its cost center is 310100, and below in the Accounting assignment the cost center is 310100. It must be 310310, we must update something for the material document pick the correct cost center in every Mat doc they can make. please assist the customization or changes to be made.

Thanks

Ryan

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi,

First check in CR02 in costing tab which cost center are you using?

Please check the Manual Reposting of Costs KB11N? to edit the material document.

OBYC and VKOA for account determination or account assignment.

Through OKB9 you can only default for the cost center.

SAP OSS Note 409520.

Regards,

R.Brahmankar

Former Member
0 Kudos

Hi,

Go to CR02 in costing tab

and change ur cost centre this will help u.

Nilesh

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi Ryan,

As per SAP you can't change the cost center in routing. Bcz it read from work center.

Go to CR02 enter Work center Name press enter then change the Cost center under Costing view and save.

Go to CO02 enter order number press enter Go to Menu read master data, this time system will read the Routing with new cost center.

check and give the feed abck.

Regards,

S.Babusingh

Former Member
0 Kudos

Hi,

Find the workcenter assigned wih routing. In workcenter change mode, check in costing view tab. You can see the cost center field. Change the cost center with correct one.

Regards,

Dharma

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi,

Activity type:-

KS01,KS02 - Create & Change Cost centre Respectively.

KL01,KL02 - Create & Change Activity Type.

KP26 - Activity Output/Prices.

In CR02 while changing a work centre,you will be assigning a cost centre and activity types defined & valid for that cost centre.

So when you assign this work centre in routing,according to the time mentioned in operation,the cost will get captured.

Hope it will help you.

Regards,

R.Brahmankar