on 09-19-2008 9:31 AM
Hi,
I have to do gross requirement planning. For this I have done following settings:
Maintained strategy group 11 on the MRP screen.
Set the Mixed MRP indicator to 2 on the MRP screen.
Maintain the item category group ( NORM) on the Sales Organization screen.
Maintain the Availability check (checking group 02 in the standard system).
I have following levels of material in decending order with one to one relationship
Final product say M1
Semi finisher M2
Semi finshed M3
Raw mat M4
Now after doing the settings for strategy 11 in all the four material. When I am running mrp for M1 system is taking gross qty for plan order of M2 but it is not doing planning for lower levels though I have done the same settings for all levels.
What can be the reason for this?
Is there something I am doing wrong or am i missing something?
Please guide....
Regards,
Mayank
Dear,
You have no need to maintain the planning strategy for SFG and raw material. As you are planning on finish product and runnning MRp also on it.
So remove the Plannning strategy and Mixed MRP then run the MRP again and check the result.
Yes system will consoder the grossrequirement for Finished product only?
Do you have stock of SFG and RW in stock it will get consider during MRP run.
Use MRP type -PD and Lot size-EX,
Regards,
R.Brahmankar
Edited by: R Brahmankar on Sep 19, 2008 2:19 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You are right check ur mrp type for all semifinish and raw material.
also check strategy group for semifinished product it should be 11
now run mrp and check ur requirement for ur dependent.
it will get created.
Nilesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
MRP type for all the materials is PD and strategy in all the materials is 11.
But still when i m running mrp...system generated plan order for finished product only wihtout considering the stock....but not doing the same for dependants. There is no plan order created for other materials....like semi finised and rm..
what can be the reason...