Hi,
During Service Confirmation using IW41, is it possible to set automatic components backflush upon 'saving' in the initial screen rather than going to 'Goods Movement' screen ? Does Process Control Key (OPKC) enable this ?
Thanks.
Raj
Transaction OIOR.
Control data section.
Field: Process Control (key): SAP1 will not suit your needs, as it is not in the update mode.
You are correct, you can check the entries for the Process control key using transaction OPKC and create your own (category 30 for PM/SM orders)
I have never used this, and the documentation suggests it is at time of confirmation.
I would suggest this would happen at final confirmation of the operation - operation system status CNF, not PCNF.
Note: Auto GR is only relevant for Production Orders.
Let us know how this works for you.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
Whaile creating an order you enter your component and in the end of line item you will see Backflush check box and when release the order and want to withdraw the material it will not let you to do so.
Posting of this material will take place when you do confirmation of material IW41. After confirrmation you will see in order that material issued cost is updated and material document created. There is no need of MIGO in this scenario.
And now if you 3 quantity of material and you want to post 1 material back to store. First cancel the confirmation by IW45 and then go to IW41 press good movement and change movement type 262 (reverse). After that go into your order see the cost is only of 2 quantity.
If still any problem in backflushing please let me know.
Regards,
Kaushal Rai
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
[Useful info|http://www.sapfans.com/forums/viewtopic.php?f=7&t=307634]
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Experts,
I am trying to do the Backflushing with following procedure , but not able to do it
1. Created order using IW31
2. Enter the components and ticked the backflushing indicator
3. Relese the order
4. Done Time confirmation using IW41 , clicked on goods movement button and saved it but goods movement still not posted.
I want to know where i am doing wrong step or missing any steps.
Regards,
Amar Jadhav
Backflush Determination:
- If the u201CAll componentsu201D indicator is set in the Confirmation Parameter settings in the IMG, then this setting overrides ALL other settings and ALL materials will be backflushed.
- Manual changes in the order operations override the Work Centre and Material Master settings.
- If the Material Master is set to u201CAlways backflushu201D, then this overrides the Work Centre settings.
- If the Material Master is set to u201CWork centre decides whether to backflushu201D, then the Work Centre must also be set for backflushing for the process to work.
The backflush process for PM/CS orders still requires you to access the goods movement screen in IW41 where the materials with valid backflush indicators will be displayed. If you do not enter this screen then the materials will not be backflushed.
[Useful info|http://www.sapfans.com/forums/viewtopic.php?f=7&t=307634]
Hi,
May be you can check this out.
In SPRO ... Completion Confirmation --> "Define Control Parameters for Completion Confirmations", for the Plant and Order Type, under "Logs/Error handling" section, tick the check boxes "Goods Movement" and "Termination for incorrect Goods Mvt". If you perform IW41 and Goods Mvt, system will display error msg if goods movement is inccorect.
Thanks.
Raj
Transaction OIOR.
Control data section.
Field: Process Control (key): SAP1
You can check the entries for the Process control key using transaction OPKC, or create your own (category 30 for PM/SM orders)
Note: Auto GR is only relevant for Production Orders.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
check this OIOR. Plant Maintenance and Customer Service->Maintenance and Service Processing-->Define Control Parameters for Completion Confirmations.
make a setting for material movements, tick in check box of all components,
this can solve your issue
pl try
ashok
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
i think if you have activated the back flush in the maintenance order then there is no need to go goods movement.it will automatically posted
regards
thyagarajan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I tried both but in IW41 I necessarily had to go to the 'Goods Movement' tab and then save to backflush the components.
How do we set the "Backflushing" indicator in the Component detail screen (in the Service Order) for a specific Order Type by default ? If this is set, I find that the backflushing is automatically posted.
Thanks.
Raj
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.