on 09-19-2008 6:53 AM
Hi gurus,
I have done variant configuration. Created a configurable material, created class and characteristics.
E.g. My configurable material is a door. The characteristics are Colour/Size/Type etc.
The values are: Colour:Green/Red - Size:2m/2.5m(wood) - Type: Small/big
I want to order from suppliers Red colour, Green colour, wood etc and keep them in stock.
How can I connect values with materials Red colour, Green colour etc in order to reduce their stock every time a Sales Order takes place????
How can I say for example that Green reduces 2kg and Red 3kg of the stocked colours? or for example the small wood 2 square m /the big 3 sqm?????etc
I do not want to use PP and MRP...I do not want a Production order to be created for every Sales order, I want for Every Sales Order the Stock of raw materials to be reduced..
Thank you...
Hi Theodoros,
I don't think that there is way to achieve that without creating production orders.
best regards, Udo
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Had u created a configurable profile ? and link all Material master with all those classification value and class together ?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.