on 09-18-2008 10:00 PM
Hi,
I´m having a problem with material stock. I get two different values on MB5B and MBEWH table for the same material, plant and date.
Material: TP05891070
Company code: 531
Plant: 7101
Selection Date: 01.01.2008 to 31.01.2008
On MB5B, I get:
Stock/Value on 01.01.2008 14,203.100KG 374,010.90 PEN
Total/Val. of Receipts 5,541.900KG 94,518.53 PEN
Total/Value of Issues 19,745.000KG 468,549.25 PEN
Stock/Value on 31.01.2008 0.000KG 19.82- PEN
On MBEWH table, I get:
TP05891070 2007 12 14,203.100 KG 374,010.90PEN
TP05891070 2008 01 0.000KG 0.00PEN
Why is there a difference on Final Stock for 01.2008?
From which table or report does MB5B get -19.82?
I was looking all tables MB5B use, but I haven´t found that value.
I hope u can help me. Thanks!
Jocelyne
Edited by: Jocelyne Garibaldi on Sep 18, 2008 11:01 PM
MB5B calculates backwards from today all the material documents and arrives at the stock quantities. The stock values are the values associated with each material document, either debit or credit. Apart from the material documents the price change documents (which get generated when MR21 is done) also will be taken into account for arriving at stock value.
I think probably price change (MR21) might have been done on back date after 31.01.08.
Regards,
GSL.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
106 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.