Hi,
We have an extended classic scenario (SRM 5.5). We replicate vendor with BBPGETVD (and BBPUPDVD) and then we use BBP_UPDATE_PORG to replicated these vendor to the local purch org.
However, any vendors have their link to the backend in the bbpmainint. Is that ok?
Many thanks!!
Regards
Patricia
in ECS the purchasing docs i.e. PO/Contract will be copied in ECC
which requires the vendors to be assigned to relevant ECC PORG
this ino is required in SRM also
so what you have is OK
BR
Dinesh