on 09-18-2008 9:37 AM
definition of safety stock, re-order point, lot size and replenishment lead time. how they are calculated in consumption based planing related to MM?
hi,
Safety stock is the stock which is used when there are delayed delieveries in your plant...
So called safety stock...
Its value you assign in MRP view of MMR...
Reorder point is point till which you want to maintain stock level constantly in your warehouse....whenever the reorder point is greater than the Stock total....the procurement is hit and the system generates a PR, PO etc depending on the setting in the MRP...
Lot size- it is total req. in numbers for which you want to hit the procurement....
Replenishment lead time:Total time for the in-house production or for the external procurement of a product. In in-house production, the replenishment lead time is determined to cover all BOM levels.
Regards
Priyanka.P
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Refer this link for the process for re-order point planning
http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d256344af11d182b40000e829fbfe/frameset.htm
Reorder Point
If the stock falls below this quantity, the system flags the material for requirements planning by creating a planning file entry.
With manual reorder point planning, you enter the reorder point manually. With automatic reorder point planning, the system determines the reorder point automatically for forecasting purposes.
If you are creating a material master record, you must always enter the reorder point manually, even if it is later overwritten by the system. This makes it possible to plan material requirements, even before
forecasting.
Minimum lot size
Minimum procurement quantity
Maximum lot size
Quantity that is not allowed to be exceeded during procurement.
Safety stock
Specifies the quantity whose purpose is to satisfy unexpectedly high demand in the coverage period.
The risk of shortfalls is reduced by having a safety stock.
With manual reorder point planning, you can enter a value in the material master record. However, it is merely for information.
With automatic reorder point planning and forecast-based planning, the system determines and adjusts the value automatically for forecasting purposes.
Minimum Safety Stock
The quantity that defines the lower limit for safety stock. This value
cannot be exceeded.
Lot size (materials planning)
Key that determines which lot-sizing procedure the system uses within materials planning to calculate the quantity to be procured or produced.
Thanks & Regards,
Kiran
Edited by: Kiran. V on Sep 18, 2008 11:11 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
> safety stock
The purpose of the safety stock is to prevent a material shortage from occurring. In order to determine the safety stock level, you must first specify the risk of a material shortage and also the desired service level.
http://www.sap-basis-abap.com/mm/what-is-safety-stock.htm
> re-order point
The requirements calculation only calculates replenishment requirements when the current stock falls below the reorder point. (In Other words its a Calculation procedure)
> lot size
Lot-sizing procedures serve to calculate the procurement quantities, that is, the purchase order and production quantities.
You define lot-sizing procedures in Customizing for MRP in the IMG activity Check lot-sizing procedure.
You assign the required lot-sizing procedure to the material in the Lot size field in the material master (MRP 1 view).
> replenishment lead time
Total time for the in-house production or for the external procurement of a product. In in-house production, the replenishment lead time is determined to cover all BOM levels.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Safety stock
The quantity of stock to satisfy high requirements in the stocking-up period.
The purpose of the safety stock is to prevent material shortage. To determine the safety stock level, you must specify the risk of a material shortage and the desired service level.
Safety stock is not used in production
Lot size (materials planning)
Key that determines which lot-sizing procedure the system uses within materials planning to calculate the quantity to be procured or produced.
Reorder Point
If the stock falls below this quantity, the system flags the material for requirements planning
Regards
Merwyn
.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.