Hi SAPper,

I have an error from SAP when creating routing.

Actual my routing consist of several operations

Header Routing for finish good UoM = BOX

10 Spray Drying UoM KG

20 Press UoM BOX

30 Firing UoM BOX

40 Packing UoM BOX

the problem is we must enter the conversion between UoM in operation to UoM in header routing

100 BOX equal 3,275.59 KG

or

1 BOX requal 32.76 KG

But:

1. in routing operation UoM conversion doesn;t support decimal

2. the space is too small for long numeric

how can i dea with this issue.

Kindly help

Beest regards,

Freddy Ha

Accepted Solutions (1)

Accepted Solutions (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi,

At SE11 you need to see what measure field is linked to the quantity field. But I'm not sure about it.

Goto tranaction CUNI and chage the decimal places of the unit of measure for the qty field unit.

Or with the help of ABAPer try to chang the technically.

Regards,

R.Brahmankar

Answers (3)

Answers (3)

Former Member
0 Kudos

Propose one more semifinish to split the operation in routing

Former Member
0 Kudos

Hi!

Actually you will have to define the conversion as 100 BOX = 3276 KG. This is applicable wherever we define an alternative UOM and give unit conversion factor, may it be additional data of material master or alternative unit for work center capacity. This is because it is designed like that. The UOM is stored in table as numerator and denominator without decimals. If you want you can get it modified from developer but that is not suggestible.

Regards,

Uday

Former Member
0 Kudos

Hi,

learn from all your idea maybe i must approace the user to split the routing.

Means that try not to combine two different process in a single routing, thus introduce one more

semi finish.

Yes, thanx you very much for all your help.

Good day everybody.

best regards,

FreddyHa

former_member199502
Active Contributor
0 Kudos

Hi Freddy,

SAP doesnot allows u to enter more than 5 character length.In your case you have to maintain 100 BOX =3276 KG then system will take 1 Box =32.76 KG.hope this will help