I request your inputs for a particular scenario in which
A material is sent to the subcontacting vendor for repair. If the material can't be repaired it is scrapped at the vendor location itself without sending the material back to the plant. Is there a partiular movement type or way in which the material can be scrapped at the subcontracting location without taking it back in the plant .
Thanks
Hi,
You can use movement type 551'O' to scrap the material @ vendor location.
Regards
Ravi shankar.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hai,
You can scrap the material at the sub contractor palce by doing MB1A Goods issue transcation with MVt type 551 with special stock indicator O . This is for with drawal for scrapping from Unres SC stock,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Use MB1A 551 O
Regards
Merwyn
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Use Movement Type 551 Scrapping from unrestricted-use stock.
Regards,
Ashok
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Try MB1A + 551 + 'O'.
Csaba
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Sub contracting material valuated in plant prmises only so use MT
551 in MB1C
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.