cancel
Showing results for 
Search instead for 
Did you mean: 

Diff B/W PRD Storage Loc and Storage Loc for EP

former_member198892
Participant
0 Kudos

Hi,

Could you elaborate PRD Storage Loc and Storage Loc for EP in MRP2 View in Material Mater.

Thnaks & Regards,

Dhanush.S.T

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Production Storage location and External Procurement Storage locations are relevant for Finished goods.

Its maintained in the MMR in case were the FG is being both internally produced and externally procured,

These respective storage locations are proposed in the purchase requisition during materials planning for subsequent storage of the materials.

In the case of a material procured externally, EP storage location is proposed in the planned order in materials planning.

Production Storage Location will be the receiving storage location to which the receipt of the material is posted on confirmation of Production.

Regards

Merwyn