on 09-16-2008 1:15 PM
Hello
My query is that how to use MCRE report.
when i execute MCRE transaction after enetering a plant , i get 3 cloulmns 1) REQ qty 2) withdrawl qty 3)issued Value
system is showing which qtities here.
Thanks
Br,
Akkshaya
Requirement Quantity
Quantity of material components needed to produce the expected order quantity.
Quantity withdrawn
Quantity of a component withdrawn when a goods issue is posted for a production order
Issued Value
Value of the quantity of a component for which a goods issue has been posted for the production order. The system derives this value from the price in the material master record
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
After verifying, I came to know that this MCRE report executes based on PP data :
Its mentioned that :
This report used for analyzing the actual material usage against plan in manufacturing process.
This eighther for a single material or for a combination of materials. I hope this above line explanation and details of display columns in previous reply will give you a clear picuture about the data displayed.
Regards,
Syed Hussain.
Dear,
Please found:
Requirement Quantity
Quantity of material components needed to produce the expected order quantity.
Use
In the standard Shop Floor Information System, this key figure is calculated when a material usage analysis is carried out. It is then updated in the information structure S026.
Quantity withdrawn
Quantity of a component withdrawn when a goods issue is posted for a production order.
Use
In the standard Shop Floor Information System, this key figure is calculated when a material usage analysis is carried out. It is then updated in information structure S026.
Issued Value
Value of the quantity of a component for which a goods issue has been posted for the production order. The system derives this value from the price in the material master record.
Use
In the standard Shop Floor Information System, this key figure is calculated when a material usage analysis is carried out. It is then updated in information structure S026.
-
Regards,
Syed Hussain.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.