Skip to Content

Archived discussions are read-only. Learn more about SAP Q&A

Same material number Ciffing from different ECC system

Hello Gurus,

I have APO system connected with two ECC system.

If there is a material with the same name in both the system how does the APO system finds the respective system.

Even if I assign BSG for the logical systems, to which system will the transaction data will be transferred after planning?

Thanks,

Siva.

Former Member
Former Member replied

Although I do not have real-time experience working in this kind of scenario from what I understand there will be two product-codes based on the BSG.

Eg. HAMMER@BSG1 will be the Product code for material HAMMER coming from your first ECC system which is mapped to BSG1 and HAMMER@BSG2 will be the product code for material HAMMER comping from the other second ECC system that is mapped to BSG2.

Transaction data will then flow back from APO to respective ECC system based on the BSG mapping. Note in the Distribution Definition you maintain the connected ECC logical system name as well.

Hope this helps.

Thanks,

Somnath

0 View this answer in context
Not what you were looking for? View more on this topic or Ask a question