vb mrp type is set in material master. it means reorder levels will be fed manually in sap. so rol,and other levels based on lot size selected is compulsory to feed in system. which helps during mrp run output.
regards
points if solved/helpful
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Give the lot size and the value say(fixed lot size,or minimum and maximum lot size)
rgds
srini
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
yes, it is required to maintain the Reorder point..
Check whether the source is assigned in source list.....Proper enteries in Purchasing view, lot size, MRP type...etc..
Anything else..revert back...
Regards
Priyanka.P
AWARD IF HELPFULL
Edited by: Priyanka Paltanwale on Sep 16, 2008 9:27 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In case of VB reorder point then you have to maintain the following in MRP views in MMR.
1. Re-order point
2. Lot size
3. Minimum lot size
4. Maximum lot size
5. MRP controller
6. Availability check
if you want you can maintain Fixed lot size & Maximum stock level
In case of PD,
Maintain Lot size, MRP controller , GR processing time, Plnd delivery time, Availability check
Thanks & regards,
Kiran
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
7 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.