RE-ORDER POINT

Former Member
0 Kudos

While preparing material master template MRP type few are VB and others PD. if it is VB re order point is compulsory or not.what are the other precautions i have to take care in this regard ?

thanks in advance.

naagsekhar

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

vb mrp type is set in material master. it means reorder levels will be fed manually in sap. so rol,and other levels based on lot size selected is compulsory to feed in system. which helps during mrp run output.

regards

points if solved/helpful

Former Member
0 Kudos

Hi

Give the lot size and the value say(fixed lot size,or minimum and maximum lot size)

rgds

srini

former_member581212
Active Contributor
0 Kudos

yes, it is required to maintain the Reorder point..

Check whether the source is assigned in source list.....Proper enteries in Purchasing view, lot size, MRP type...etc..

Anything else..revert back...

Regards

Priyanka.P

AWARD IF HELPFULL

Edited by: Priyanka Paltanwale on Sep 16, 2008 9:27 AM

former_member335885
Active Contributor
0 Kudos

Hi,

In case of VB reorder point then you have to maintain the following in MRP views in MMR.

1. Re-order point

2. Lot size

3. Minimum lot size

4. Maximum lot size

5. MRP controller

6. Availability check

if you want you can maintain Fixed lot size & Maximum stock level

In case of PD,

Maintain Lot size, MRP controller , GR processing time, Plnd delivery time, Availability check

Thanks & regards,