subcontracting challan

Former Member
0 Kudos

hi,

i am facing one problem at the time of reconciling the subcontracting challan i.e CHALLAN MATERIAL IS DIFFERENT FROM MATERIAL DOCUMENT.

HELPFUL ANSWER WILL BE REWARDED

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

Check the BOM usage it may be universal, creat bom with universal then create po and challan.

former_member581212
Active Contributor
0 Kudos

hi,

At the time of GR (MIGO), you have to "Refer Subcontracting Challan" and the same challan and year should be used in J1IFQ. Also check the components of GR doc (for mvmt type 543) and Challan, there should not be mismatch.

Go to J1FR and check status of challan, see it is already reconciled or not?

Former Member
0 Kudos

HI I HAVE CREATED SUBCONTRACTING CHALLAN WITH REF TO MATERIAL DOCUMENT NO WHICH IS GENERATED AT THE TIME OF GOOD ISSUE(311 E). NOW AFTER GR I AM DOING THE RECONCILE OF SUB CHALLAN, AT THE TIME OF THIS OPERATION I AM GETTING THAT ERROR.

kunal_ingale
Active Contributor
0 Kudos

hi

after creating challan in challan which material is there

and that material only will come at time of reconcillation

use gr no 101 for reconcillation and not the tp doc no

http://sap.ittoolbox.com/groups/technical-functional/sap-log-mm/subcontracting-challan-903899

regards

kunal