cancel
Showing results for 
Search instead for 
Did you mean: 

scrap

Former Member
0 Kudos

hi experts

I want maintain scrap material in bom

If I give negative quanti in component list with material name

It ok or somethingelse configuration settings required

thanx in advance

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

closed

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi,

Did you get it? Assign the relevent point before closing the thread.

Regards,

R.Brahmankar

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi,

Assign this in BOM for - ve (negetive qty) no configuration setting required.

Regards,

R.Brahmankar

Former Member
0 Kudos

"Scrap" the word usually used in domain is "By-Product" in SAP as it have some valuation.

So, quantity with negative sign is enough in the BOM.

Kiran