on 09-15-2008 10:39 AM
Dear Expert
I created inspection plan for a material and generated inspection lot after GR from PO. But it's status is coming as CRTD CHCR SPRQ, release status is not coming, pls suggest where i want to look for this?.
Dear Anupama,
Mr. Shayamal is very correct (Thanks for correction for Second point , i forget to mention it) , If you have multiple Inspection plan for the same material then also you will get Inspection lots in 'CRTD' status and you have to Select/ Assign inspection plan manually in QA02.
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In one of the case, This issue is due to wrong classification value maintained for class (018) in inspection plan at header (Extras => Classification=> Class & characteristics) level.
Pls call me in case of any issues.
BR,
Madhukar Poul
08793720304
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi.. All,
If the only purpose is to change the system status from "CRTD.." to "REL..", go to QA02 and change the "Start date" and "Insp. End Date" to current date and "Save".
The system status will change.
Please correct me if it has any repercussions.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
If your material required Inspection Plan to be assigned to Inspection Lot (Inspect with task list in QM view of material) & characteristics checking (Check Chars tick in QM view material master), then system searches for a valid & released inspection plan with the characteristics details maintained. If such inspection plan is not maintained, then the inspection lot status is CRTD (Created) but not REL (Released). Here the additional status as CHCR (Characteristics must be created) indicates that above two conditions are met. Here you can create an inspection plan with key date as that before the inspection lot creation date & use as Goods Receipt & status as Released. Then in transaction Change Inspection Lot (QA02), assign this inspection plan manually & also calculate sample manually. Then after saving the inspection lot status will change to REL (Released).
Regards,
Prashant
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi.. All,
If the only purpose is to change the system status from "CRTD.." to "REL..", go to QA02 and change the "Start date" and "Insp. End Date" to current date and "Save".
The system status will change.
Please correct me if it has any repercussions.
HI
first ensure, wether the material is having the inspection plan (QP02) with uasege 5.
and if the plan is there goto QA02 or QA32 change inspection plan. click on the inspection specification and sapmle tabs
then save the lot, the status will change from CRT to REl
-pltry
-ashok
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Anupama
First check whether for particular material Inspection lot created or not, or else create and assign.
Go to QA12 put the lot and press enter
then select Insp. Specification tab. you will find task list/Spec button press it
If sampling procedure is mentioned please go to Sample tab put the sapmle size and save the transaction.
Then go to QA32 and see the lot status changed over to REL status.
Regards
Honyal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Anupama,
Please do as follows :--
1. Check QM View in Material Master of Material ---> Go to Inspection Set up --> Detailed Information on Inspection type --> Select 'Inspection with Task List' & 'Automatic Assignment' along with the other settings and 'SAVE. Now future Inspection lot will be coming with 'REL' Status.
2. Please check the Inspection Plan header for Usage... it should be '05' Goods Reciept & Status '04' Released.
2. For the current Inspection lot you go to 'QA02' --> Enter Inspection Lot no > Go to Inspection Specification tab> Click on 'TakList/spec' icon to assign the specification manually and Save. Then Refresh the View in QA32 or QA33 system will show the lot status 'REL'.
Please give me the feedback whether it solve your problem or not.
Regards.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Ok, there would be two reasons, dear..
1 Check,,,,,,,,, the automatic assignment indicator is activated or not in the detailed information for the inspection type, in the inspection set up, QM view of MM. If it is not activated, simply activate it.
2 If there would be more then one inspection plan in the system for the material,plant usage (inspection plan Usage) combination, it will not attach the task list to the inspection lot, resulting the lot will not automatically get stated as REL, even though the AUTOMATIC assignment check box is activated for the inspection type.
Regards,
Shyamal
Ooooopss Quick correction here,
You said you check through QP60, I don't know how? You can simply check it through QP03, enter material code and plant and it will give you the list. But any way
The correction I am talking about it that check box of automatic assignment must be deactivated. So Deactivate it, and then try it with fresh data. you will able to assign the task list manually
Regards,
Shyamal
Edited by: Shyamal Joshi on Sep 16, 2008 10:01 AM
One more small correction mam, It's SHYAMAL not SHYAMLAL
Dear Anupama,
Check once again the following points:-
1. Inspection type '01' has been set & Active in Material master's Inspection setup data.
2. Select 'Post to Insp. Stock', 'Inspection with Task List', 'Automatic Assignment' , & 'Check Chars' in the Deatiled information on Inspection type section of Inspection set up data.
3. In the same section you have to set 'For each material Document item' for 'Control Inspection Lot'.
4. Check Quality Plan of the material for Header Level Data and set Usage '05' & Sataus '04' . Please also ensure that Deletion Flag is not set.
5. Check in Customization that For Inspection Type '01', Usage '05' is set.
6. Please check the Inspection Plan Key date also , If key date of the inspection plan is in future or your Inspection lot is created in previous date before plan has made then also you will get it in 'CRTD'.
7. Ensure that material has assigned in the plan.
Please revert back with your findings.
Thanks.
Hi Anupama,
Are you using any User Status for the Inspection type 01. If yes, it may be possible that you have added some object for initial user status, which may prevent automatic release of inspection lot even though everything is correct.
Also try 'Give Approval' in Inspection Lot menu. This may be one of the reason.
Otherwise all other possibilities are already mentioned above by all.
Hope this will help.
Hemant
See, you only deactivate the check box and wait for a new inspection lot. No need to change/delete any other masters.
Now should concern with the Status REL or CRTD only. Because if the inspection plan will not get assigned automatically, as you asked for, then the status for the inspection lot will be CRTD not REL.
But in both the cases the CHCR status will be there, that is for "Characterist. must be created" i.e. MIC are created and RR to be done.
I hope it is clear to you now!!!!
Regards,
Shyamal
Edited by: Shyamal Joshi on Sep 17, 2008 2:55 PM
and you can test the scenario in the Quality or Testing server. where your doubts will get cleared.
Oooooppss I am sorry dear,
Now see finally let me make it clear again
If you want the lot ro get REL "automatically" then
That check box must be activated
I apologies for the misunderstanding the previous time.
And I again say this automatic assignment tick will work only if you have a single inspection plan for the material in the system. In other words, the material must be assigned to one inspection plan only.
So if the status will set REL with the inspection lot creation itself then inspection plan will assign automatically, otherwise it will not have REL status.
So to have the status to be set REL manually and inspection plan assignment automatically is not possible. Pls correct me if I am misunderstanding your requirement again!!!
Regards,
Shyamal
Dear Experts still the same pblm with the Inspection lot status CRTD CHCR SPRQ is coming while lot created after GR of PO.....
When i entered No of containers in the Insp lot change mode (QA02 ) Orgin tab, Inspection Plan is taking.
Pls suggest your valuable comments
Edited by: Anupama on Sep 29, 2008 2:21 PM
Hi Anupama,
The entire seen is like this,,,,,,
- The automatic assignment is activated
- The material is assigned to one inspection plan only, not assign to more than one inspection plan.
- The UOM of material and inspection plan are same.
- Inspection plan is released in the system
- The usage of inspection plan and inspection lot are matching (same)
- The inspection plan's Valid from date is prior to the inspection lot creation date.
Correct?
Now let me know, in the QA02 screen now there are total thee screen Tabs.
1 Origin
2 Insp. Specification - Where we assign the task list
3 Sample:- from where the samples are getting calculated.
Now let me know, what is the condition of the lot when it is created, is it cleared up to screen tab 2. i.e. the task list assignment is found done and sample calculation pending only.
Both are pending?
Regards,
Shyamal
Hello,
I am having a similar issue with inspection lots. The information provided has been very helpful, but I have not been able to resolve my issue. Forgive me if my terminology is not clear as SAP is very new to me. Here goes:
When my inspectors try to enter an inspection lot with transaction QE01, they receive the error "The function you selected cannot be carried out." When you click the detailed info button, a transaction analysis box appears with the following info:
Influence of System Status on Transactions
Stat Description Influence
CRTD Created Disallowed
If you click on status display instead detailed info, there is a system status tab with CRTD, PREQ, CHCR & SPRQ. All four options are checked, but to the right of the first two there is a grayed out piece of paper with an arrow. It appears the system is checking for these features, but they aren't properly set up.
As of now, we have no inspection plans, so material is simply checked to drawings and specifications and and an accept/reject usage decision is entered by receiving inspectors. My immediate concern is to get the material released that is stuck in inspection. If I click on the inspection task list, there is no task list created for the material.
Our receiving inspection supervisor was the only one trained in QM and he left the company this week. Is anyone familiar with this error?I'm desperate for a solution.
Regards,
N. King
Hi King
If the inspection lot status is REL then only you can record results
First check the Mat.Master record QM view - inspection with task list /Mat.specification checked or not
if not check(make tick mark)
then QP01 create inspection plan for this material and assign MIC with date older than inspection lot creation date.
QA02 - assign Task list
click on sample button - system status changed to REL from CRTD
then u can record result
try and come back if u need further
Sami
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.