Stock tranfer rejection

Hi all,

We have two plants X and Y in the same company code.

Material Mat is manufactured in plant X and then transferred to

plant Y with Stock Transport order ( Two Step ).

In same cases after receiving the goods , Plant Y want to do a rejection of the received material.

If we use movement type 122, the stock in sitting

in Plant X Stock in transit, but we are not able to receive the stock in unrestricted stock with 101 again in plant X.

Please suggest if there is any other method to receive the goods .

Thanks

replied

Hi

If you want to receive back the rejection material from Y Plant to X Plant ....then create STO from the X Plant to Y Plant for the rejection material and based on this STO, the Y plant can despatch the rej. mat to X plant.

With regards

S.Baskaran