Overhead/order type - DEPENDENCY

Hi all,

I have created a cost sheet. We have 3 different processes in our operation and each process have different overheads rate.

I have assigned the dependency: overhead/order type D050 for each overhead in the cost sheet.

But when I executingCK11N the system is not calculating the o/h for the material. Itu2019s showing zero value for the o/h but in the process order it is showing the cost estimation value.

Can any one please guide me through this, whether I have missed out anything any where?

We have only one cost sheet and we are in ECC6.0 version.