Hi all,

I have created a cost sheet. We have 3 different processes in our operation and each process have different overheads rate.

I have assigned the dependency: overhead/order type D050 for each overhead in the cost sheet.

But when I executingCK11N the system is not calculating the o/h for the material. Itu2019s showing zero value for the o/h but in the process order it is showing the cost estimation value.

Can any one please guide me through this, whether I have missed out anything any where?

We have only one cost sheet and we are in ECC6.0 version.

Regards

SAP4ME

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hello

You have to define the different dependency based on the requirement and under each dependency you have to configure the different types overhead with different validity period and different percentage. Similary the samy may be assigned to the costing sheet. While assigning the costing sheet, ple clearly specify the base, what are the overheads willbe costed and enter the cost center as the credity key.

Please check all these above settings and come back if it is not solved.

Regards

Madhav

Former Member
0 Kudos

any guidence on my issue