long term planing.

deepu_p2
Active Participant
0 Kudos

Hi guys

what is long term planing. can anyone send me some info about that.

what is the diff between longterm planing and mrp.

Accepted Solutions (0)

Answers (3)

Answers (3)

deepu_p2
Active Participant
0 Kudos

thanks guys

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi,

Basically LTP is simulative MRP to simulate and see all the results like production capacity plan/ raw material plan/ profit margin. here we are using the same master data like material master, recipe, BOM etc

In MS31 - you create a LTP version where you can mention the PIR version where you enter the planning data in MD61.

Please refer the link for complete details,

[Long Term Planning|https://forums.sdn.sap.com/click.jspa?searchID=16254554&messageID=6097199]

Please go through this link also,

http://help.sap.com/saphelp_47x200/helpdata/en/92/bf055544bd11d182b40000e829fbfe/frameset.htm

Regards,

R.Brahmankar

Former Member
0 Kudos

Hi

There are two different types of Planning.

1.Operative Planning 2. Long Term Planning

The Operative Planning is what we do in MD01 and MD02.

Long term planning will be done for the Materials which are taking long lead time to procure.

It will be done in simulation mode and it will be transferred to Regular operative planning.

For the long term planning the following steps are needed,

1.create the PIRs in simulation version. (MD61)

2.Create Planning scenario in MS31 assign the simulation version of PIR, then save and release.

3.Run the Long term planning run in MS01/ MS02.

4.Transfer the Planning result to Operative Planning thro' MD43.

5. Then check the planning result of the raw material in MD04.

Pre-requisite: In the material master MRP type should be fixing type.

Plz revert back if not clear

Regards

Bala

deepu_p2
Active Participant
0 Kudos

hi

when i am doing ms 31. its letting me to go in to pir. but not allowing me to enter the version.

Former Member
0 Kudos

Hi Deepu

in MS31 go to Tab Planned Independent requirements and click it you will get a pop up window where you could enter the Versions to be used for this Planning Scenario.

Jade

deepu_p2
Active Participant
0 Kudos

yes i am doing that. i am getting a pop up. but i am not able to enter anything in to that.its all blue

deepu_p2
Active Participant
0 Kudos

ya i got it dude.

thanks