Hi gurus!

Im having problems with storage location, when i tried to do a MIGO with a PO it doesn´t load the storage location, so the material doesn´t go to the storage refered in the PO.

this problems happens when i create the PO refered to a purchase requisition and the purchase R has in the position Cost Center (K) and subcontracting (L).

If i do not enter the Cost Center (K) when creating the migo with the PO the storage location appears.

Can somebody help me pls?

Thanks in advance

Juan Breton.

replied

the moment you enter the cost center in the Po means you dont want your stock to be update

you want the cost of the materil diretcly get posted to the cost center.

if you want as a stock than you should not enter the cost center than only you can receive at storage location.