dependent reqmt

Former Member
0 Kudos

Hi All,

I have a scenario like, i maintain

one finish product and 3 sub assmy and each have components

I got the plnned order for the fini and the 2 sub-assmy

but for the one sub assmy after MRP run .systeml not created the planned order for this assmy and the corresponding its compnents

istead , for this sub assmby . MDO4 screen . it show the DEP reqmt.

and no more reqmt is capture for its components

pls clear me

what i wa

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Raj,

- Check in MD05 is there any exception massage is there regarding that Assembly.

- Check MRP type for that Assembly (It should be PD/M0)

Regards,

Shymal

Former Member
0 Kudos

hi all,

the mrp type for sub assmy is PD only

and no stock is maintian

dhaval_choksi3
Active Contributor
0 Kudos

Hi Raj,

Have you check Exception massages in MD05?

Regards,

Dhaval

Former Member
0 Kudos

HI all,

i just receive the flw error,

An in-house production time of 1.004 workdays was calculated.

This value is greater than the allowed maximum value of 999 workdays.

i donot maintian the prod time for this material in matrl master.

and the lot size procedure is lot for lot(ex)

Edited by: raj on Sep 15, 2008 8:32 AM

dhaval_choksi3
Active Contributor
0 Kudos

Hi Raj,

Then problem must be in your Routing / Recipe or in scheduling formula of Work center / resource.

- Check all the relevant data like Operation qty / Activity timings of all the operations.

- Check scheduling formula of assign work centers.

- Check also In house production time - -my doubt is over here-

Regards,

Dhaval

Edited by: Dhaval Choksi on Sep 15, 2008 12:29 PM

Former Member
0 Kudos

Hi Dhokhi,

  • I Checked the relevant data like Operation qty / Activity timings of all the operations.

the operation toal timing is arround 2 hrs / pc

*I Checked scheduling formula of assign work centers.

i maintian the setup and the process formula sap001 sap002, and the capacity is 14 hrs/ day

  • Check also In house production time - -i did not maintian in the material mastr

dhaval_choksi3
Active Contributor
0 Kudos

Hy Raj,

Plz spell my name correctly.

Former Member
0 Kudos

sorry yar.

mr. choksi

dhaval_choksi3
Active Contributor
0 Kudos

Hi Raj,

Reason behind this massage is problem in deriving Basic Start and finish date which comes from In house production time in material master.So check this data in material master of that sub assembly.

Regards,

Dhaval

Former Member
0 Kudos

Hi choksi,

i just maintained the things in mrp view of the material master

1. plnd delivery time 10 days

2. totl. repl lead time 2 days

Edited by: raj on Sep 15, 2008 10:00 AM

csaba_szommer
Active Contributor
0 Kudos

Hi,

You've got the DepReq - this indicates that the BOM is OK.

1. What abou the MRP type of you sub-assy? If it is 'ND' (e.g.) MRP run won't create PldOrd.

2. Doesn't its stock cover the rquirements?

Please give more info.

Csaba

Edited by: Csaba Szommer on Sep 12, 2008 4:14 PM