on 09-11-2008 7:23 AM
In KSO1 AND IN KS02 IAM not in a position to modify the cost cenetre period.Then
how to change.Let me know the process FOR EX PROVIOUS DATE IS 01.04.2005 TO 30.06.2008.
NOE I WANT TO DO FORM 01.04.2005 TO 31.03.2010
Moderator: Thread locked due to double posting this issue.
Sumati
The analysis period cannot be beyond the maximum date, if thats what you are referring to. Unfortunately you cannot extend the validity date. If you have not posted any entries, you can delete the cost center with the tcode KS04 and recreate the cost center with the same number but a different date.
Karthik
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
you can also do it in OKEON.
wishes
Amuthan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Goto TCode KS02 and enter your Controlling Area and then your Cost Centre
Goto Menu ...Edit-Analysis period - and enter periods valid from...to
Cheers
Srinivas
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
pls go to t.code ks02 and clik on menu -edit-analysis period
there u can able to change
Thanks & Regards
phaneendra
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.