In KSO1 AND IN KS02 IAM not in a position to modify the cost cenetre period.Then

how to change.Let me know the process FOR EX PROVIOUS DATE IS 01.04.2005 TO 30.06.2008.

NOE I WANT TO DO FORM 01.04.2005 TO 31.03.2010

Moderator: Thread locked due to double posting this issue.

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Sumati

The analysis period cannot be beyond the maximum date, if thats what you are referring to. Unfortunately you cannot extend the validity date. If you have not posted any entries, you can delete the cost center with the tcode KS04 and recreate the cost center with the same number but a different date.

Karthik

Former Member
0 Kudos

hi

you can also do it in OKEON.

wishes

Amuthan

srinivasa_maruvada
Active Contributor
0 Kudos

Hi

Goto TCode KS02 and enter your Controlling Area and then your Cost Centre

Goto Menu ...Edit-Analysis period - and enter periods valid from...to

Cheers

Srinivas

Former Member
0 Kudos

hi

pls go to t.code ks02 and clik on menu -edit-analysis period

there u can able to change

Thanks & Regards