where did system get prod scheduler

Dear SAPper,

In material master i have delete production scheduler.

But still i wonder when creating planned order from MRP don;t have production scheduler.

If the planned order is converted into prod order the prod scheduler is still blank.

But after i save and check prod order again the prod scheduler is filled.

I check OPL8 the substitute prod scheduler is blank too.

Where did system get the prod scheduler?

best regards,

Freddy Ha

replied

Hi,

In OPKP you have assign order type at bottom of screen.

And delete the production scheduling profile from OPJ9 also (00001)

Please refer this link also,

[prod scheduler|https://forums.sdn.sap.com/click.jspa?searchID=16156978&messageID=5732403]

Regards,

R.Brahmankar

Edited by: R Brahmankar on Sep 11, 2008 12:12 PM