MRP and Consumption based planning

Former Member
0 Kudos

Hi

For a Particular material can we do both Consumption based planning with a reorder point and also Material requirement planning, with the same material master settings???

Please get back to me.

Jade

Accepted Solutions (0)

Answers (1)

Answers (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi,

Could you please elaborate in details?

As Consumption based planning is one type of MRP.

consumption based planning uses the past consumption data to calculate the future reqmts.

Here the net reqmts calculation is triggered when the stock level falls below reorder point.

Follow the link

http://help.sap.com/saphelp_470/helpdata/en/7d/c2821c454011d182b40000e829fbfe/frameset.htm

For config follow this

http://help.sap.com/bp_bblibrary/600/Documentation/V05_BB_ConfigGuide_EN_US.doc#_Toc155602273

Regards,

R.Brahmankar

Former Member
0 Kudos

Hi

The requirement is that with the same material we have to do reorder point planning as well as normal MRP (PIRs to Production order)