cancel
Showing results for 
Search instead for 
Did you mean: 

Problems with Retractor of Profit center UPB_RET_BASH

Former Member
0 Kudos

Hello,

Iam using two structures UPB_SND_COPS, UPB_SND_BASH one for Cost center retraction and the other for Profit Center retraction.

I have a problem in Production, the profit center retraction doesnt work and I dont receive any message of error from ECC (R/3), Iam debugging the FM UPBR_DATA_PACKAGE_MAP and I see the right generation of program 47SN... in table KCDSM. BUT I dont understand why dosent work the data transfer.

I need help.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

If there is no error message switch on the trace and check the system log.

Former Member
0 Kudos

OK, And that how can help me?, I believe that I need a procedure to activate the transfer and another tool for to test the transfer data generated by the dynamic program 47SN516AM9N442ZFIX4GXY49C.

Answers (0)