cancel
Showing results for 
Search instead for 
Did you mean: 

inspection lot status

Former Member
0 Kudos

Hi ,

we r creating the inspection lot from production .

but after creating the lot in quality the status is in created mode.

but we want the status should be released mode.

we assigned MIC in the quality plan for that material.

thank u

Accepted Solutions (0)

Answers (5)

Answers (5)

former_member577912
Participant
0 Kudos

HI,

goto qa02 enter ur lot no. there , then goto insp. specification tab & assign task list (click on task list tab). then save. now check in qa32 ur lot is in relesed status

manish

dhaval_choksi3
Active Contributor
0 Kudos

Hi,

Try by doing this,

MM02 -- > QM View ---> Inspection set up ---> select inspection type ---> tick Automatic Assignment and untick Manual sample calc.

Then generate new Inspection lot and check its status.

Regadrs,

Dhaval

Former Member
0 Kudos

I have a similar question, thought Dahval could help me...

When creating an inspection lot the system sometimes automatically calculates the sample size which in return copies onto the notification.

To get rid of this, should MANUAL SAMPLE CALCULATION be checked? Anything else need to change? And what would be the outcome? Would the field be editable when the next inspection lot is created?

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi Shetpally Deepthi,

Go to QA02,

Depends upon your settings in Matl master for that matl , if your inspection specifications is from Task list / Matl spec , it will take sample size from the sampling procedure defined over there.

If your inspection is without TL / Matl spec and if you have choosen Manual sample calculation , then in this case you can change sample qty maually after resetting the sample calculation.

After changing , once you save , lot status will be changed to REL status.

Regards,

R.Brahmankar

Former Member
0 Kudos

HI

are you trying for inprocess lot or GR lot.

ok any how if the LOT belongs to Inprocess, then your material Task list CA01/02should be actvated with Some MIC for th operation,

if the LOt related to Prodcution GR, then try to create a inspection plan QP01/02,

if you changed thedata for plan after lot creation then goto QA02, enter the lot number and click on inspectionspecification tab and click on taks list then clcik onsample tab

and save.

-ashok

Former Member
0 Kudos

Hi

Open the lot by QA02 or through QA32, select Insp spec tab, select tasklist and save it, the CRTD status will change ro REL.