can we block the cost center where we can block the cost center?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi!

You can block the cost center. You can do the same by going control tab of any cost center in change mode (KS02).

Her you will find different options to block the cost center like :

Actual Primary Costs

Plan primary costs

Act. Secondary Costs

Plan Secondary Costs

You can select options to block the cost center as per your requirement.

Hope it clears to you. Pls revert back if it find useful to you.

Thanks & Regards,

Taral Patel

Former Member
0 Kudos

tara:- assinge the point for u,

i have one doubt i,e

Actual Primary Costs

Plan primary costs

Act. Secondary Costs

Plan Secondary Costs

how we can block these point wise, and where we can do BLOCK PLZ HELP FOR THIS ONE.

Former Member
0 Kudos

Hi,

Goto KS02 T.code and enter cost center.

then goto "control" tab.

if you want block postings,click on check box for the following.

Actual Primary Costs

Plan primary costs

Act. Secondary Costs

Plan Secondary Costs

Hope this helps you.

Thanks,

Rau

Answers (1)

Answers (1)

Former Member
0 Kudos

Simple

Check all the boxes in the control tab,

You are done