Variant Configuration with Projects

Hello All,

I am looking into the functionality of Variant configuration in PS. I am aware of the steps required such as defining chracteristic, assigning them to class, setting object dependency etc. However I am not able to produce the same in system. It will be great if I could get detail step by step guide on configuring the above.

Thanks in advance.

Thanks

Sarang

replied

Hi,

There is lot of difference in assigning material in CN01 and CN08. In CN01, you cant assign material directly, have to do it using BOM. This is for template purpose ie standard network. The CN08 assignment is for assembly processing. In assembly processing, when you create Sales order for a material, project gets created automatically. So CN01 is of ur interest.

Regards