Dear SD Gurus,
Sales order is created with multiple schedule lines for the same material. The system by default sets the Goods Issue date /Load date/Mater avail. date / Transportation Plan. Date.
I am changing the above dates manually for all the schedule lines as per the delivery requirements...
Now the dates for the last updated schedule lines remains same and the dates for the other schedule lines which are changes are setting back to the default dates.
For ex
I Schedule line (Default): Goods Issue date /Load date/Mater avail. date / Transportation Plan. Dates are 15th Sep
II Schedule line (Default): Goods Issue date /Load date/Mater avail. date / Transportation Plan. Dates are 15th Oct
Now I have changed the I Schedule line dates to 10th Sep and the II Schedule line dates to 10th Oct and saved the doc....Now the I schedule dates are set back to 15th Sep even though I have changed it to 10th Sep and the II Schedule line dates shows 10th Oct(Changed date)
Can someone help me how to resolve this?
Cheers
What ever the date the system produced for the 1st Scheduleline will be remains same and it can be changed manually to its future date not to the past date.
Because the system saying that, based on the production calculation i can give u material only on 15th, but ur saying i need it on 10th.
It is not possible.
Subramanian.Ramasamy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Cheers,
It won,t work like you are doing whether you off the Delivery scheduling or put the future date in Requested delivery date in sales order to create the order & delivery.
Regards
San
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Pls also check whether u have maintaind any Lead Times in Days at the Sales Doc type(VOV8).
reg
Deepak
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Cheers,
The date of the I Schedule line is the Required delivery date you have entered in Sales Order - Business data. So you cannot change this date. You can only change the Required Delivery & the I schedule line date would change.
Now the system is determining more than one Schedule line because the materail might not be in stock on the "required delivery date", so it determines the future date based on the configurations & gives you a future date. So you can change this future date manually.
Hope this helps...
Give points if useful...
Thanks,
Jignesh Mehta
Mumbai
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Schedule line confirms the delivry date and the quantity to be delivered on that particular date.
In your case if you want to change the scheduline date, first see what is the " Lead time you have maintained for your material in material master record".
Change the lead time as" Zero" in you MMR and now try to change the scheduline date.
Thanks & Regards
Guru Prasad
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.