09-08-2008 11:03 AM
Hi All,
When I 'm tring to Draw sample for inspection system is giving this error
Number of sample devices ( 10) is greater than lot size ( 20 - 20)
My Lot size of 20 and in sample procedure for lot size of 20 sample quanity is 4 but in drawing sample system is picking 10 quantity ,
Please guide me to solve the same
bye
aMit
11-24-2008 9:30 AM
Hello,
Regarding the error EG349.....
Please check the following facts:
- Are all devices in the warehouse? If this is right and the flag 'LW'
is NOT set in 'Define Parameter(s) for Sampling
Inspection/Certification', then the error message is correct.
- If this flag was set, please check also if you have set the flag
'Include devices not installed' during transaction EG84.
I hope this information helps.
Regards
Olivia