cancel
Showing results for 
Search instead for 
Did you mean: 

Stability Study

Former Member
0 Kudos

Hi,

Am working stability study cycle of QM. My questn, is ...

When am select change testing schedule key in action box and enter group and group counter of inspection plan system gives error msg, 'The inspection plan entered is not compitible with the strategy :QSTABI. I have create inspn. plan with usage 9 & status 4.

Please revert me asap.

Thanks in advance.

Vishal

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

hi

pl check the startegy enterd in plan and task list are same?

-ashok

Former Member
0 Kudos

Yes, I have assign strategy only in plan but i dont know how it can be assign in inspection task list. Can u please tell me?

Thanks,

Vishal

Former Member
0 Kudos

hi

are you creating IP42 and cwbqm,

or are you changing the plan.

can you give me the message class and number\

-ashok

Former Member
0 Kudos

msg. no. QST078

Rgds,

Former Member
0 Kudos

hi can you check the t-code IP02 plan's strategy is same in t-code cwbqm

and check the inspection point is 200 for QP02 data

-ashok

Former Member
0 Kudos

In ip02 it has been assigned. it only not in qp02.

Rgds,

vishal

Answers (0)