now taking overhead calculation

Former Member
0 Kudos

hi

plz find the problems?

I have created 2 raw materials for that 2 origin groups and 2 overhead key ,these assigned to2 overhead group. these overhead group is assigned to their RAW MATIRIAL MASTER DATA.

Base----


RM1,RM2

Cost element frm origin TO ORIGIN

400000(RM1 cost element) R1(origin grp)

400000(RM2 cost element) R2(origin grp)

1. OVERHEAD RATE:RM1(10%),RM2(10%)

2. OVER HEAD DEPENDENCY: D010(overhead rate /key)

3. CREDIT KEYu2019S:RC1,RC2

IN THE COST SHEET:

10 RM1

20 RM1(O.H.RATE) 10 RC1

30 RM2

40 RM2 30 RC2

I have created separate overhead cost element.

FOR example RM1=100/-,RM2=200/-AND overhead rate:10% on RM1,10%ON RM2

Now overhead calculation is not showing in CK11N. I want overhead calculation separately on each RAW MATIRIAL. PLEASE tell me, where is mistake and how to make?

thank you

nagesh

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Dear Nagesh, In the costing sheet rows, you need to taken 30 in both the 'From row' and 'To Row'. Trust this answers to your query and helps much in resolving your problem! Regards, Ashok SINGH

Answers (1)

Answers (1)

Former Member
0 Kudos

DId you assign the costing sheet to the costing variant in OKKN?

Please check

Former Member
0 Kudos

HI

ya..

i have assigned costing sheet to costing variant, production overhead calculation is calculated correctly but rm is not taking

thank you

nagesh