Single material document

Hello all

Presently my client is doing GI, Conf, GR all separately againt production order. So it is creating multiple material documents. Now theyI want to have 1 mat doc for some other purpose. How to do that?

Thanks & regds

Former Member
Former Member replied

Hi

U can use PP03 control key for the operation where u want to do GR (normaly last operation) and backflush indicator for the materials . Assign the materials to the same operation (PP03 indicator). And confirm through CO11n, u will get one material doc for GI and GR.

Check and revert back