I have a requirement -
I want to do the audit inspection of the FG or SFG at defined intervals.
Like i am producing some product.It takes 2 months to produce.(product may be a big turbine or anything like that)
While this 2 months i want to inspect the material with different specs time to time (say every week or may be unequal intervals).(It need not tobe stock relevant inspection)
How can I map this scenario?
Hi, Sandip,
I hope for a Particular type of turbine you will have a separate material code and a separate routing / Recipe.
Then you can achieve it by the insrocess inspection, hence logically taking that will be your inprocess product. So have the QM related settings in your Recipe / Routing and perform the checks accordingly.
Note:- You will in need to design your routing accordingly for the Phases and operations for the Time they takes.
E.g.
Operation: 0010 define it will take 20 Days.
Operation: 0020 define it will take 20 Days.
Phase:0010 Will have QC MICs attached to it.
Operation: 0030 define it will take 10 Days.
Phase:0010 Will have QC MICs attached to it.
Regards,
Shyamal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
If these are products like a turbine, then maybe you can create an equipment master for it. Then you can treat it as a PM inspection. Create a couple of maintainance schedules for it and you should be able to several inspection lots then for it.
I suggest talking to a PM person on this.
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.