raw material stock to be consider against sales order in md50(i.e mrp run)

former_member577912
Participant
0 Kudos

when i run MD50 against particular sales order, it is not considering stock of raw material. it is creating planned order for raw material which is already in stock. my problem is that when i run mrp it should consider my raw material stock.

manish.

Accepted Solutions (1)

Accepted Solutions (1)

former_member577912
Participant
0 Kudos

i am not assigning any strategy to my finished product, its totally depends on market condintion(mto & mts).

manish

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi,

For all the BOM components (up to last level) check in MRP 4 view of Material master

Individual / Collective - It should be Individual or Individual/Collective.

If is maintain as Collective then you will not get planing Proposals though MD50.

For all BOM headers Materials (FERT , HALB ) check in MRP 4 view for MRP for Dependent requirement should be maintain as Dependent requirement are Planned

Check the "Selection method" field in MRP4 view for the FG.

It should have values "Nil" or "1"

Regards,

R.Brahmankar

Answers (4)

Answers (4)

former_member577912
Participant
0 Kudos

.

Former Member
0 Kudos

Hi,

For raw material above one level in MRP4 view Individual/ Collective req, it should be 2- Collective.

Now run MRp and check the result. System will consider raw material stock.

Regards,

Dharma

rupesh_brahmankar3
Active Contributor
0 Kudos

Hi,

Are you using Planning strategy 20??

Procurement Before Sales

This stage does not apply to this strategy because there is no production without a sales order. If sales orders exist in the system in advance, production is performed before the required delivery date.

Refer this link,

http://help.sap.com/saphelp_45b/helpdata/en/cb/7f9b7043b711d189410000e829fbbd/frameset.htm

dhaval_choksi3
Active Contributor
0 Kudos

Hy Manish,

Just check whether Individual / Collective requirement is set as Individual (Option 1) in MRP 4 View of that Material.

Regards,

Dhaval

former_member577912
Participant
0 Kudos

mr.dhaval

indi/collctive(1) indicator to be set for raw material or finished matetrial.

manish

Former Member
0 Kudos

Hi,

Not for raw & FERT material, assign for halb material above one level of raw material.

Regards,

Dharma

dhaval_choksi3
Active Contributor
0 Kudos

Hi Manish,

Correctly said by all our Experts (Mr.Brahmankar , Mr.Dharma)

Now all you have to decide whether you want to go for this individual or Collective requirment type.Because on one hand

- If you select individual requirement then system will not consider available stock and generate Proposals for every single requirments.

Also you will find PR and Plan order with account assignment of Sales order (in case of MD50)

- If you select collective requirement then system will not generate planing proposals through MD50.In that case you have to go for individual MRP (MD02 / MD03 / MD41 / MD42).

Regards,