on 09-05-2008 8:24 AM
hi,
i created new order type for rework (ZRWK)
i deleted bom applcation pp01 in order dependent parameters for ZRWK order type (OPL8).
now i created production order in co01 in ZRWK order type
system showing error::
No routing application is defined for order type ZRWK in plant 1000
Message no. CO109
Diagnosis
To create a production order, you first have to maintain an application for selecting bills of material.
Procedure
Go into Customizing and maintain an application for order type ZRWK in plant 1000
how to solve this.???
thx in advance
.
Hi,
In order type dependent parameters under BOM applications PP01. If you is field blank. BOM will not selected
In OPL 8 you need to maintain the routing selection and selection ID with task list type.
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Prakash,
Check in T code OPL8 - for the particular order type - check whether application field is filled with P -
Rotuings,if not enter and save and then try creating a production order.
Check & revert back.
Regards
Mangalraj.S
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
my client product is GEAR - so i created a new production order type (ZGER).
when i created a production order for my FERT(GEAR) in ZGER order type. system takes bom and routing which is maintained.
after we made confirmation. now my fert in FG store.
after quality inspection. if they need rework
they send to rework storage location for rework.
now production person has to create ZRWK production order. and he has to assign that components and operation manually(what he want).
this is my requirement.
so i created ZRWK for rework order
when i create in co01
sys shows error
how to create Rework (ZRWK) production order by assigning component and operation manually???System error:
No routing application is defined for order type ZRWK in plant PGL
Message no. CO109
Diagnosis
To create a production order, you first have to maintain an application for selecting bills of material.
Procedure
Go into Customizing and maintain an application for order type ZRWK in plant PGL.
Dear Prakash,
Dont mention any value under Production version selection,
Routing selection value let it be 4 - routing/Ref.Operation set Option - manual selection and in BOM
application let it no BOM provided if you have created such an application.
So in this case you can add manually the components.
Check & erevrt back still if you face any problem.
Regards
Mangalraj.S
hi mangalraj
still im facing the same problem
i maintained routing application - 4
Bom application - empty
but i cant create production order....
i want to create produciton order with ZRWK order type with manual component and operation assignment in production order.
is it possible???
for this wat i have to do in OPL8??
thx in advance..
Dear Prakash,
Provide me these details,
1.Component's has to be added manually?
2.Whether are you going to use some reference operation set as a routing for this order type?Which
means whether automatically that reference operation set has to be picked?
Let's assume that you are going to use only reference operation set for this order type,so you have to
assign or create a new selection id with these values,say
SelID SelPr Type Usage Description Stat Description of the status
RR 01 S 1 Production 4 Released (general)
So in OPL8,check with task list type as S - Reference operation set,Routing Selection - 4,selection id is
RR.So likewise if you assign someother selection id say as per its settings,priority the system will work.
Say for selection ID 1 and routing selection is 4,first priority will be given to routing,the system first checks
whether a routing exists for that product or else it proposes for a reference operation set as it has the 2nd
priority.
Likewise change as per your requirement and check.
Regards
Mangalraj.S
thx for reply
i understand about ref operation set. but we cant predefined the machine and operation as ref operation set. so they want to enter in production order itself. at that time only they knows howmany operation and operation at which machine for rework.
so we have to give operation sheet and bom details as blank for to enter manually.,.
is it possible????
thx in advance.
Dear Prakash,
You can define default operation in T code OPJG for an order Type and in BOM application if it's empty or if
you have assigned BOM Application as no BOM(which you have configured in T code OS30) then while
creating the production order the default operation will get picked and if required you can edit the
operations and also assign BOM Components.
Please check & confirm.
Regards
Mangalraj.S
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.