on 09-04-2008 6:54 AM
Dear all
a lot with the insp. type 04 is created.it has status REL and it has a plan. Now please guide me how can i change its plan with some other usage.is it possible
Hi Ahmad,
As you have described the lot status is REL not INSP ok then you can revert it from REL to CRTD again.
- Run trx QA02, Enter the lot number.
- Now follow the path Inspection Lot->Function->With Draw Approval---> Click over it and save. The lot status will changed from REL to CRTD.
- Now the cancellation of samples is also mandatory.
- So run trx QAC3, enter the same lot number enter the trx. and save
- Go back to QA02 and assign new Inspection plan
Regards,
Shyamal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
14 | |
10 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.