planner groupwise break up cost for an equipment.

Hi,experts,

Is there any standard t-code available to view break up cost(dept.ment wise) as well as total cost for a specfic period for an equipment?? As in a single equipment, many depts. r involved like instrumentation,electrical, mechanical etc. my client wants a report where they can view total cost for that equipment as well as break up cost like instrumentaion cost,electrical cost,mechanical cost etc.Please,guide me how to get this report.thanks in advance.

rgds

rajib

Former Member
Former Member replied

hi

you can get the desired result in MCI4 T code ,but provided you have created correct planner group in IMG as Mech,Elec,Inst etc,assigned in the equipment master record or created maintenance order for the equipment with planner group you have created

regards

thyagarajan