cancel
Showing results for 
Search instead for 
Did you mean: 

non Stock Materials

Former Member
0 Kudos

Hi,

I'm wondering if someone can help?

We have a need to created materials for service products such as Installation, Commissioning, Training etc.

Is there a way of setting up these products as non-stocked, non-deliverable items so that they won't appear as demand on our factory. I also need to make sure these products are excluded from any discount pricing.

Thanks for your help.

Mike

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Mike,

You may create the material master with material type as DIEN service, make sure the item category group as LEIS. If the item category group as LEIS, system will propose item categy as TAD based on the item categroy determination in customising. It should propose CD as schedule line, there will not be any requirement generated, no delivery ...etc.

You may control the billing and pricing relevency through the customisaton of the item category TAD.

Prase