on 09-03-2008 6:21 AM
Hi
In REM(Repetitive Manufactruing) Scenario:
Is their any possibility to create an inspection lot.
1) At the first GR and no more at subsequent GR or;
2) at each GR?
Thanks in advance
Saravana
Hi kumar
if you want to create inspection lot for REM then following are the settings
1. inspection type 13 for inprocess check for repetative with task list selection
2. maintained inspection characteristics in rate routing for which you want to maintained inspection.like inspection point
3. Inspection creation by tcode MFPR which creates inpsction lot for your production version. manually,
Regards
Pravin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Pravin
Thanks for your quick reply.
I would like to create a inspection lot for the following "
1. at the time each backflush (i mean each GR) and
2. at the time of first backflush (i mean first GR) after that subsequent backflushes should not create inspection lot.
How to perform this task. Kindly suggest.
Thanks
User | Count |
---|---|
86 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.