on 09-02-2008 6:15 AM
hi
plz suggest me for the rework order cycle in discrete manufacturing
thanks
surendra
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
1.Create Rework order without material at CO07 with out material .
2. Assign the settlement receiver as orginal production order at settlement rule.
3. Assign the rework material & component if needed at rework order & assign the issue storage location (unrest- use storage loaction above).
4. Do the confirmation for rework order & rework materail will be issued from stock to order
5. GR will not be done for rework order.To get stock for reworked material Do the GR for orginal order & settle the both order .
standared SAP order type PP03 for rework
Refer this therad also,
https://forums.sdn.sap.com/click.jspa?searchID=15796915&messageID=5957598
Regards,
R.Brahmankar
Edited by: R Brahmankar on Sep 2, 2008 10:55 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
i have inseted an new operation in the prodn order with an operation control key as an rework control key(copied from pp01) so that client can come to know that this operation is an rework operation so plz suggest me that if there is any difference beteween rework control key n normal control key.
thanks
surendra
Hi,
The indicator Rework is set in the control key. An operation for rework in a routing cannot be scheduled because the rework quantity has not yet been determined.You can manually enter an operation quantity for these operations in the production order.
Please check this thread also,
Regards,
R.Brahmankar